Raksha Puram Scheme

S. No. Head Total Proposed Developed Under Development
1 Zonal Road (k.m.) 1.50
2 Internal Road (k.m.) 7.23
3 Water Supply (k.m.) 8.6
4 Sever (k.m.) 8.58
5 Storm Water Drain (k.m.)
6 Internal Drains (k.m.) 15.27
7 Electricity Work (Sub Station)
33/11 K.V.
220/132/33 K.V.



8 Park (No’s) 6
9 Tubewell (No’s) 3
10 High Tanks (No’s) 2
11 Sewer Treatment Plant (No’s) 1