Defence Enclave Scheme

S. No. Head Total Proposed Developed Under Development
1 Zonal Road (k.m.) 1.95
2 Internal Road (k.m.) 4.70
3 Water Supply (k.m.) 6.65
4 Sever (k.m.) 6.65
5 Storm Water Drain (k.m.) 1.70
6 Internal Drains (k.m.) 11.60
7 Electricity Work (Sub Station)
33/11 K.V.
132/33 K.V.

1
1
8 Park (No’s) 15
9 Tubewell (No’s) 2
10 High Tanks (No’s) 1
11 Sewer Treatment Plant (No’s)